Lining condition, joint mapping, ventilation duct integrity and cross-passage condition recorded between revenue services or in single-tube closures.
Drained service reservoirs, clarifier basins and inlet works. Concrete spalling, coating breakdown and roof condition captured without crew entry.
Dam face, spillway chutes, stilling basins and outlet works. Survey-grade point cloud for the dam-safety dossier and the inspector.
Trunk sewers, interceptors and combined-sewer overflows. Defect mapping, atmosphere check and 3D point cloud without confined-space entry.
Closures cost the public. Confined-space entries cost the inspector. Rejected reports cost the asset owner twice. Scout 137 attacks all three lines.
The asset keeps carrying traffic, water or flow while the drone inspects.
A closure window the operator can actually grant, instead of days offline.
Confined-space entries when the drone records the evidence first.
Visual, gas and 3D in a single flight, every defect tagged to chainage.
Every capture is time-stamped and geo-anchored to the asset 3D model, assembled in Scout Portal into one complete, repeatable record your asset register already uses, with every defect tagged to chainage. It gives you data suitable for dam-safety, tunnel and sewer-condition review (FERC, ICOLD, EN 13508).