Production shafts, service shafts and access raises. Lining condition, set spacing and steel guides surveyed without shaft-sinking crew exposure.
Cavity monitoring after blast, dilution mapping and hangingwall stability. Survey-grade point cloud captured from a safe stand-off in the access drive.
Blind raises, ore passes and return airways. Cross-section profile, blockage check and lining condition without a crew rigging access from the top.
Decant towers, outlet works and underdrain galleries. Inspection-grade evidence for the TSF dossier without dewatering the impoundment.
A drone in the heading after a blast is the difference between a production shift and a stand-down. Scout 137 turns post-blast re-entry from a wait into a workflow.
Of underground hard-rock fatalities involve rockfall or ground failure.
Of manual ventilation survey on a mid-size operation each year.
Typical atmosphere clearance wait after blast before crews can re-enter.
Lost production per re-entry delay when an inspector can't get to the heading.
Every capture is time-stamped and geo-anchored to the mine 3D model, assembled in Scout Portal into one complete, repeatable record your survey department already uses. It gives you data suitable for ICMM, MSHA and GISTM/ANCOLD review.